Save precious floor space
Manage unplanned traffic disruptions
As the need for the optimization of your network and operations grows, so does the need to minimize central office floor space consumed by network equipment and resources.
Tellabs® 5500 and 5320L Digital Cross-connect Systems continue to increase the amount of telecommunications traffic that can be supported by a system footprint while reducing the amount of power consumed. Our Facility Replacement Program helps you take advantage of these efficiencies by enabling quick replacement of older, low-density hardware with the new, more efficient high-density hardware.
Tellabs Solution:
Tellabs uses field-proven methodologies specifically designed to manage the risk of unplanned traffic disruptions while replacing low-density port modules with high-density port modules. These methodologies have the flexibility to enable your team to balance the need for quick project completion with customer satisfaction during the cutover.
Features:
- Site Survey
Determine and document all project parameters and office-specific requirements - Planning and Circuit Audit
Audit of all facilities that are to be transferred, compare the results to your circuit layout records and work with your team to resolve any discrepancies - Site Preparation and Prewiring
Prepare and prewire of equipment for the cutover execution stage with multiple checks to ensure accuracy - Cutover Execution
Execute all steps required to successfully transfer traffic utilizing Tellabs proprietary tools